Nigerian Electricity Supply And Installation Standards Regulations 2015

Ministry of Energy and Natural Resources

Nigeria2015EnergyOther

This document describes the requirements regulating the generation, transmission, distribution, and user's site standards, guides, and recommended practices for use in the Nigerian Electricity Supply Industry (NESI). This document makes a general provision for the qualification of engineering personnel. it emphasizes that any person engaged in the generation, transmission, distribution, system operation, and trading in electricity or any aspect in the value chain of electricity supply, including but not limited to engineering designs, installations, commissioning, decommissioning and maintenance of electric power systems to achieve safe and reliable supply, and utilization of electricity in Nigeria, shall comply with the provisions of the Electric Power Sector Reform (EPSR) Act 2005, the Nigerian Electricity Supply and Installation Standards (NESIS) regulations, license terms and conditions and all other regulations, codes, standards made under the EPSR Act.

Nigerian Electricity Regulatory Commission Regulations For Independent Electricity Distribution Networks 2012

Ministry of Energy and Natural Resources

Nigeria2012EnergyOther

These regulations apply to all independent electricity distribution systems and the owners, operators and users of the distribution systems. Rule 9 of the document provides for the license application procedure. It emphasizes that all applications and related proceedings before the commission for grant of an independent electricity distribution system license shall be governed by the application for licenses regulations, including amendments and statutory re-enactments thereof.

Nigerian Electricity Regulatory Commission Regulations for Embedded Generation 2012

Ministry of Energy and Natural Resources

Nigeria2012EnergyOther

These regulations apply to all embedded generators licensees, applications for embedded generation licenses being processed by the Commission, and prospective embedded generators, unless otherwise specified. The document defines the role of distribution licensees. Some of these functions include: forecasting the future demand on its distribution system; analysing the impact of the connection of new facilities such as generation unit(s), loads, distribution lines, or substations; planning the expansion of the distribution system to ensure its adequacy to meet forecast demand and the connection of new facilities; identifying and correcting problems on quality of supply, power quality and system losses in the distribution system; and distribution planning and system studies.

Nigerian Electricity Regulatory Commission Regulation for Mini-Grids 2016

Ministry of Energy and Natural Resources

Nigeria2016EnergyOther

This document defines the mini-grid as any electricity supply system with its own power generation capacity, supplying electricity to more than one customer and which can operate in isolation from or be connected to a distribution licensee�s network. Within this regulation, the term mini-grid is used for any isolated or interconnected mini-grid generating between 0kW and 1MW of generation capacity. The regulations apply to all mini-grids with the generation capacity of up to 1MW, the owners, operators and users of the mini-grids as well as all other private or public stakeholders such as the distribution licensees or any federal or state institution or agency interacting with mini-grid owners, operators and users in Nigeria.

Nigerian Electricity Regulatory Commission: Guidelines for the Preparation of Performance Improvement Plans (PIP) by DISCOS

Ministry of Energy and Natural Resources

Nigeria2017EnergyOther

This document emphasizes that the distribution companies must ensure all data tables submitted are well-justified in the text and a clear linkage between the data tables and the text is provided. They should also maintain consistent terminology between their pip narrative and the data tables. The distribution companies are expected to show how their strategy will contribute to meeting the goals of the Federal Government�s Economic Recovery and Growth Plan, the PSRP and energy access targets over the period.

Nigerian Electricity Regulatory Commission Meter Asset Provider Regulations 2018Regulation NO: NERC-R-112

Ministry of Energy and Natural Resources

Nigeria2018EnergyOther

This regulatory document has an overarching objective to provide standard rules to encourage the development of independent and competitive meter services in NESI, eliminate estimated billing practices in NESI, attract private investment to the provision of metering services in NESI, close the metering gap through accelerated meter rollout in NESI and enhance revenue assurance in NESI.

Nigerian Electricity Regulatory Commission: Regulations for Investments in Electricity Networks in Nigeria 2015

Ministry of Energy and Natural Resources

Nigeria2015EnergyOther

These regulations provide for the procedure for investing in electricity networks in Nigeria. The primary objective of these regulations is to create strong incentives to encourage the Transmission Company of Nigeria (TCN) and the distribution companies to make appropriate and sustainable investments in capacity expansion. It also provides regulatory certainty by having a process that allows Nigerian NERC to track the investments utilities make whilst still monitoring the mechanism it adopts for utilities to recover prudential costs they incur to maintain the technical safety, security and reliability of the transportation networks.

Nigerian Electricity Regulatory Commission: Regulations on Procedure for Electricity Tariff Reviews in the Nigerian Electricity Supply Industry

Ministry of Energy and Natural Resources

Nigeria2014EnergyOther

This regulatory document provides detailed procedures to be followed in conducting electricity tariff reviews in line with the Act and the multi-year tariff order (MYTO) methodology. It also highlights the responsibilities of tariff review applicants, timelines, costs, submission requirements and detailed guidelines.